For what types of work do I need a building permit?
How do I get a building permit?
Do I need to hire a contractor or can I do work myself?
Are contractors required to be licensed?
How much does a building permit cost?
How do I determine the valuation of my project?
What type of plans do I need to submit?
What should be included in the plan sets and how should they be prepared?
Do I need an architect or engineer to prepare my plans?
How long does it take to get a permit?
What happens if I start work without a building permit?
For what types of work do I need a building permit?
A building permit is required any time you do work that is regulated by the building code. This would include any work to the permanent weather resistive surfaces of the dwelling such as the siding, windows or roof. Any structural alterations or repairs to those members require a permit. If you change the use of a space or finish unfinished space, a permit is required. Dwelling additions, garages, and decks require permits.
Work that is exempt from a permit includes painting, wallpapering, flooring, kitchen cabinets, minor repairs, and detached storage buildings not exceeding 120 square feet.
If you are unsure if the project you are starting requires a permit, please contact the Inspections Division for advice.
How do I get a building permit?
The process starts by filling out a building permit application. Permit applications are available in displays set up by the front counter of the Inspections Office on the main floor of City Hall or from staff members. You can fill out the application at City Hall or you may take the application with you and fill it out at home. You can ask that applications be faxed or mailed, or you can download it.
Information you will need to provide on the application includes your name, address, telephone number, description of the work, and the valuation of the work. If you need help filling out the application, a staff member will be happy to assist you.
To start the permit issuance process, you will need to submit your completed application and two sets of plans, if plans are required, to a staff member. They will either issue the permit to you or forward the permit to another staff member depending on the nature of the work. You can submit the permit application in person, by mail, or by fax.
Once a permit is ready to be issued, you will be called at the number you provided on the application. You may then pay for and pick up the permit.
Do I need to hire a contractor or can I do work myself?
Neither city ordinances nor any state regulations prohibit a homeowner from doing work in their own home. So, the answer to whether you need to hire a contractor largely lies with your own abilities to do the work you propose. If you feel uncomfortable doing electrical wiring for example, you may wish to hire an electrical contractor although you may do the work yourself. In either case, make sure you check on the permitting requirements for the type of work you are proposing to do.
If the building is a commercial building, you may do work on property you own without hiring a contractor and without a license. Exceptions to this include plumbing, mechanical, and electrical work that must be performed by licensed contractors.
Are contractors required to be licensed?
Minnesota has a law requiring residential builders, remodelers, and roofers to be licensed as a means to help protect homeowners. Residential contractors are required to have a copy of their residential contractor license. Commercial contractors must provide proof of insurance and a City license when obtaining building permits.
You can verify if a contractor is licensed by calling the Minnesota Department of Labor and Industry Residential Building Contractors Unit at 651-284-5065.
If your contractor asks you to obtain a permit for him or tells you that he can do the work cheaper because he is not licensed, he should be reported immediately to the Minnesota Department of Labor and Industry Residential Building Contractors Unit.
For more information, read Do Your Homework Before Hiring a Building Contractor from the Minnesota Department of Labor and Industry.
How much does a building permit cost?
Permit fees have a number of different components. First is the building permit fee. Building permit fees are derived from a sliding scale based on valuation. Plan review fees are also charged in addition to the building permit fee for projects other than roofing, siding, window replacement, and some minor repairs. The plan review fee is based on 65% of the building permit fee. In addition to permit and review fees, a state surcharge is collected at the rate of 50 cents per $1000. Here are some examples of the cost of a permit for various projects (plan review fees are included where applicable):
- Deck ($3000 valuation) $144
- Basement remodeling ($5000 valuation) $191
- Roof house ($7500 valuation) $162
- Garage ($10,000 valuation) $310
- Dwelling Addition ($75,000 valuation) $1,390
If you are building a new home, fees such as park dedication, sewer access charges, and water access charges may apply.
If you wish to have an idea of the cost of a permit for budgeting reasons, the Inspections Division would be happy to provide an estimate of the permit fee for you.
Please note that permit fees can vary by city and are subject to change from time to time.
How do I determine the valuation of my project?
Valuations should reflect the total cost of the project including all finishing, roofing, electrical, plumbing, heating, air conditioning, and other construction work. The valuation should also include labor even if you are doing the work yourself. Valuations are frequently compared to available cost estimators and will be adjusted if the valuation provided appears to be in error.
What type of plans do I need to submit?
Probably the most important step in the permit process is the submittal and review of building plans. The purpose of developing a set of plans is to provide a written document of the scope of your project. A staff member will review your plans to determine in advance that the proposed work complies with the various building rules. In order for the review to be a help to the builder or owner, it is important that the plans be as detailed as possible. The goal is to uncover potential problem areas while the project is still on paper and save costly corrections later. Applicants are asked to provide two sets of plans. The City retains one set, the other set will be returned to the permit applicant with any corrections noted.
What should be included in the plan sets and how should they be prepared?
As noted above, plans should be detailed. They must be neatly drawn and drawn to a useable scale. One-quarter inch to one foot is a common scale. Typical residential plans would include a site plan (decks, additions, and garages only), floor plans, cross sections, elevations, details of various structural components, and a window schedule. Plans should be dimensioned and include information on use of rooms, wall and ceiling finishes, and lumber sizes and spacing. Read more about what must be included in building plans.
Do I need an architect or engineer to prepare my plans?
The short answer is no. You can prepare your own plans or your contractor or a drafting service can prepare them for you. If you are having multiple contractors bid on your project, you will be better able to compare the bids if you prepare the plans and specs yourself rather than have each contractor prepare a set.
If your project is very complex, you may find it advantageous to hire a professional designer to assist you. Also, if your design involves complicated framing techniques or the use of steel I-beams, for example, you may be required to verify that the designs meet code as a part of the plan review process. The Inspections Division may require that a licensed engineer provide this verification.
How long does it take to get a permit?
Permits for work that requires no review are issued the same day and generally at the time the permit application is submitted. Permits where review of plans is necessary can take one to two weeks. Some plans may need to be reviewed by more than one city department. For this reason, it is important that you plan ahead and have your permit application and plans submitted far enough in advance of the start of work that the permitting process does not delay the start of your project.
See a schedule of the approximate time periods that it takes to issue various types of permits.
What happens if I start work without a building permit?
Since failure to obtain a permit is a violation of city ordinances and state law, fines may be levied. Also, the building code includes provisions for the fees to be doubled if work starts prior to obtaining a permit.
Does the City inspect the work?
All work is subject to inspection. The number and type of inspections vary depending on the work being done. When the permit is issued, you will receive an orange inspection record card that lists the types of inspection that you will need to call for your project. The telephone number to call is also on the record card as well as the permit number.
It is the owner or contractors responsibility to call for an inspection when the work is ready. When you call in, your conversation would go something like this: "I am calling for a footing inspection at 123 Oak Street for tomorrow afternoon. My permit number is 1234." The person taking the call will give you the time the inspector will be at your home. We make every effort to accommodate requests for specific inspection times. We ask that you call at least 24 hours in advance to schedule your inspection.
Where can I get information on codes and construction?
The Inspections Division has a number of handouts that address common building projects. These are free to the public and most are available on this web site. Other excellent sources of information include books that can be purchased in the home improvement sections of bookstores and building material suppliers. There is a wealth of excellent information available online also.